Panama Canal faces deeper cuts as El Niño drought threatens global shipping

Rainfall in three months will decide if ships drop to 29
The canal administrator is watching September through November to determine whether further cuts are needed by early 2027.
Mark

So the canal is cutting ships from 34 to 32 starting mid-September. That sounds like a small number—what does that actually mean for shipping costs and delays?

Mimi

It compounds what's already a tight situation. When you reduce capacity by roughly six percent, and you have companies competing for slots, the auction prices spike. We're seeing bids over a million dollars just to get through. That cost gets passed down.

Luke

But we should be clear: those million-dollar bids are happening because of the Middle East disruption, not just because of the canal cuts. The canal is one pressure among several.

Mimi

True. But the canal is the pressure that's controllable by weather, which makes it different. The Middle East situation is geopolitical. This is climate.

Mark

The administrator mentioned February or March as the next decision point. What's she actually watching?

Mimi

Three months of rainfall data—September, October, November. If those months are dry, she'll cut to 29 ships. If they're wet, she might hold at 32.

Luke

And we should note: she's making this call based on forecasts of El Niño strength, not on certainty. El Niño is expected to be the strongest in 40 years, but weather forecasting still has margins of error.

Mimi

Absolutely. But the canal can't wait for certainty. It has to act on the best information available.

Mark

What about the Rio Indio reservoir? Is that actually going to solve this?

Mimi

In theory, yes—it's designed to supply the canal and half of Panama's population for 50 years. But it won't be ready for five to six years. So this drought, and potentially the next one, will have to be managed the old way.

Luke

And we don't know if the project will actually be completed on schedule, or if it will cost more than expected, or if it will deliver the water volumes promised. Those are real unknowns.

  • El Niño, forecast to be the most powerful in forty years, is draining the freshwater reservoirs that power the canal's locks — and the crisis is accelerating faster than forecasters hoped.
  • Daily transits have already fallen from 36 to 34 ships, and a further cut to 32 begins September 15, with the canal administrator warning of reductions as low as 29 ships by early 2027 if rains fail.
  • Larger vessels are being forced to carry lighter loads after the maximum draft was reduced from 15.2 to 14.6 meters, squeezing cargo capacity across global supply chains.
  • The disruption lands at the worst possible moment — Middle East shipping lanes have contracted sharply due to the US-Israel war on Iran, pushing more vessels toward Panama and driving transit slot prices past one million dollars at auction.
  • A new reservoir at Rio Indio promises a permanent solution, but construction will take five to six years, leaving the canal and the world it serves to watch the rain and wait.

At the narrow waist of the Americas, where five percent of the world's maritime trade passes each day, nature is reasserting its authority over human ambition. The Panama Canal — a marvel of engineering that has long bent geography to commerce — now bends to the will of El Niño, the strongest such climate pattern in four decades, as drought drains the freshwater lakes that make the locks run. Beginning September 15, daily ship transits will fall to 32, with the possibility of deeper cuts ahead, reminding the world that even its most indispensable corridors remain subject to rain and sky.

The Panama Canal is tightening its grip on ship traffic once more. Starting September 15, daily transits will fall to 32 vessels — down from 34 in recent weeks and well below the 36 ships that passed through in August. Canal administrator Ilya Espino de Marotta announced the cuts Monday, warning she is prepared to reduce the limit further to 29 ships by February or March if the next three months bring insufficient rainfall.

The culprit is El Niño, expected to be the strongest climate event of its kind in four decades. Panama declared a nationwide drought emergency on August 26. The canal depends entirely on freshwater to operate its locks, drawing from two artificial lakes — Gatun and Alajuela — that are fed by rainfall alone. Each transiting ship consumes roughly 200 million liters of water, and as lake levels fall, the authority faces increasingly hard choices. The canal has also reduced the maximum draft from 15.2 to 14.6 meters, forcing larger vessels to carry less cargo and adding further strain to global supply chains.

The crisis arrives at a particularly fraught moment. Shipping through the Strait of Hormuz has contracted sharply amid the US-Israel war on Iran, redirecting more vessels toward Panama. Competition for transit slots has grown so fierce that some companies have paid over one million dollars at auction just to secure passage. The bottleneck in Panama is now compounding an already strained global system that handles five percent of world maritime trade.

Panama's longer-term answer is a new reservoir at Rio Indio, designed to supply the canal and more than half the country's population for the next fifty years. But the project is five to six years from completion. Until then, the canal and the shipping industry it anchors will watch the seasonal forecasts closely, waiting to learn whether El Niño will relent — or tighten its hold further into the new year.

The Panama Canal, a waterway that moves five percent of the world's maritime trade, is tightening the screws on traffic again. Starting September 15, the number of ships allowed through daily will drop to 32—down from 34 just weeks earlier, and a sharp fall from the 36 vessels that passed through in August. The new administrator of the Panama Canal Authority, Ilya Espino de Marotta, announced the cuts on Monday, warning that even steeper reductions may come if the drought worsens. She told news agencies she is prepared to lower the limit further to 29 ships by February or March if rainfall over the next three months does not improve.

The threat is El Niño, the climate pattern that is expected to be the strongest recorded in the past four decades. Panama's government declared a nationwide state of emergency over the drought on August 26, and the canal—which depends entirely on freshwater to operate its locks—is caught in the middle. Water for the system comes from two artificial reservoirs, Gatun and Alajuela lakes, both fed by rainfall. Each ship that transits consumes roughly 200 million liters of water. As El Niño intensifies, water levels in both lakes have already begun to fall, forcing the canal authority to make hard choices about how many vessels it can accommodate.

The canal has also reduced the maximum draft—the depth of water a ship needs to float safely—from 15.2 meters to 14.6 meters. This means larger vessels now have to carry less cargo to pass through, adding another layer of disruption to global supply chains. The restrictions are not yet as severe as the 2023-24 drought, when daily crossings fell as low as 22 ships, but the trajectory is clear. Espino said that rainfall in September, October, and November will be decisive in determining whether further cuts are necessary in the new year.

The timing of this crisis is particularly acute because the canal's importance to global shipping has grown sharply. Traffic through the Strait of Hormuz in the Middle East has fallen significantly due to the US-Israel war on Iran, pushing more vessels to seek alternative routes. Some shipping companies have recently paid more than one million dollars at auction just to secure a transit slot through the canal. The bottleneck in Panama is now compounding an already strained global shipping system.

Panama is pursuing a longer-term solution: a new reservoir at Rio Indio, a river in the country's center, designed to supply water for canal operations and more than half of Panama's population for the next 50 years. But the project will take five to six years to complete. Espino told Reuters that once operational, the Rio Indio reservoir would ensure the canal never again has to resort to cutting draft limits or reducing transits. Until then, the canal and the global shipping industry it serves will have to navigate an uncertain season, watching rainfall forecasts and waiting to see whether El Niño loosens its grip.

Depending on how much rain falls in September, October and November—the three critical months—that will determine whether I need to lower any slots further in January, February or March.
— Ilya Espino de Marotta, Panama Canal Authority administrator
The reservoir would ensure that the canal never again has to resort to lowering the draft or reducing the number of transits.
— Ilya Espino de Marotta, on the Rio Indio reservoir project
Quieres la nota completa? Lee el original en Al Jazeera ↗
Contáctanos FAQ