Menon and Meir installed mounting hardware on the station's 3B power channel to enable future IROSA solar array installation, expanding power capacity for ISS operations. This was Menon's first spacewalk and Meir's sixth; six of eight planned IROSA assemblies have been deployed since 2021, with two remaining for delivery later this year.